Grid-tied Solar Power Project

Xinjiang Kuitun 20MWp PV-Stock Farming Integration Solar Power Plant

Date:2015-12-26Source:未知Views:times

Project Capacity: 20MWp

Annual Output: 27 million kWh

Features of Project

PV-stock farming integration by power generating on livestock shed and large-scale mutton sheep farming under shed;

Eco reclamation of saline and alkaline land under PV modules to supply fodder to mutton sheep. 

CCE Oasis invested this project with total 0.31 billion RMB and managed the project operation